This article is 2 years old
Enough of perpetual 'under study' flood solutions, MP tells minister
The government should stop promising solutions to the flooding problem in Kuala Lumpur that is perpetually "under study", said Kepong MP Lim Lip Eng.
This was after Federal Territories Minister Shahidan Kassim said a feasibility study was being conducted to build a high capacity underground flood water storage tunnel to overcome the issue of flash floods.
Verifying user
RM12.50 / month
- Unlimited access to award-winning journalism
- Comment and share your opinions on all our articles
- Gift interesting stories to your friends
- Tax deductable